Dissemination
We
will announce via different ways to inform More than 3000 end users benefit from
the facilities of the project. These users represent different sectors of the
university such as:
Colleges:
Colleges
inside and outside the Campus, and one college outside Assiut (220 Km from
Assiut.)
University hospitals:
-
University hospital.
-
Student hospital.
-
Veteran
hospital.
Institutes:
-
South Egypt
Cancer Institute.
-
Student housing:
-
Male student housing
-
Female student housing.
University administration:
Each
will feel the different advantages of upgrading the infrastructure such
advantages can be summarized in the following:
-
The connection rate will be increased from the existing 2Mbps
to the planned speed.
-
Reliability of the service will be improved.
1.Maintenance
carried by local staff as we did in the past 8 Years.Each
individual will receive proper training during the duration of
the project.
2. Professional
maintenance contract with companies paid by the university as we
did in the past.
Leased line will be paid by the
university as in the past. The project will finance the yearly
budget for the rent of the leased line during the contract
period. The university will continue paying the rent, which is
expected to be greatly reduced in the future.