| 1001 |
" The Egyptian Experience In Water Storage and Dams, Case Study : Aswan High Dam |
2006 |
| 1002 |
3-D numerical simulation of flow and clear water scour by interaction between bridge piers |
2006 |
| 1003 |
3D Reconstruction of a real traffic cross section based on the combination between the laser scanner point cloud and the digital photos |
2006 |
| 1004 |
An investigation of shallow water flow over permeable bed with reference to surface irrigation |
2006 |
| 1005 |
Constitutive Model for Time-Dependent Bonding and Debonding along FRP-Concrete Interface |
2006 |
| 1006 |
Developed Technique for Automatic Point Cloud Texturing from Multi Images Applied to a Complex Site |
2006 |
| 1007 |
Effect of Spacing of Fasteners Used to Attach the Corrugated Shear Plate to the Envelope Frame on Its Elastic Buckling Behavior |
2006 |
| 1008 |
Effect of Spacing of Fasteners Used to Attach the Corrugated Shear Plate to the Envelope Frame on Its Elastic Buckling Behavior |
2006 |
| 1009 |
Effect of Spacing of Fasteners Used to Attach the Corrugated Shear Plate to the Envelope Frame on Its Elastic Buckling Behavior |
2006 |
| 1010 |
Effect of Bottom Lateral Bracings on the Behaviour of Composite Steel-Concrete Bridges Curved in Plan |
2006 |